Ground breaking (Youtube video)


Sept 30, 2015

October 30, 2015

November 9, 2015


December 11, 2015

H/VAC guys setting the curb for the new heating and cooling units.


Sheetrock going up in the nursery


Expandable foam being applied in lobby.


Starting the process of cutting a door into the existing fellowship hall. The wall is 14 inches thick. The blade just made it through.


Cody Top cutting the wall into manageable pieces.


1245 Sheetrock in the kitchen


Roof H/VAC units installed 12-21-15

January 13

Jan 19, 2016

Extending roof for elevator


Installing skylights


Large crane to install last H/Vac unit

Feb 9, 2016

 

March 05


Stucco being applied to outside


opening being cut into existing foyer


volunteers at work


Opening for double doors from lobby into existing building


So thankful for the MANY volunteers who have logged hours
running jack hammers, pounding with sledge hammers,
scooping and hauling out debris etc.


Much of the taping is done. Bathrooms and kitchen are textured and ready for paint.

March 25, 2016


Stucco is being applied around the interior windows by the Driv-it crew


Electrician are wrapping up the rough-in.


Tile crew has just started in the restrooms.


The restrooms and kitchen are painted and flooring is in.


Kitchen cabinets arrived today and are being installed.

April 7, 2016


View from the current foyer. Doors are in.


Fellowship hall is painted and grid work is being put in place for ceiling tile.


"tile guy" is doing a meticulous job of laying tile in the bathrooms.


Flat roof crew is finishing the trim despite the blustery weather.