Ground
breaking (Youtube video)




Sept 30, 2015
October 30, 2015


November 9, 2015


December 11, 2015

H/VAC guys setting the curb for the new heating and cooling units.

Sheetrock going up in the nursery

Expandable foam being applied in lobby.

Starting the process of cutting a door into the existing fellowship hall. The
wall is 14 inches thick. The blade just made it through.

Cody Top cutting the wall into manageable pieces.

1245 Sheetrock in the kitchen

Roof H/VAC units installed 12-21-15
January 13
Jan 19, 2016

Extending roof for elevator

Installing skylights

Large crane to install last H/Vac unit
Feb 9, 2016
March 05

Stucco being applied to outside

opening being cut into existing foyer

volunteers at work

Opening for double doors from lobby into existing building

So thankful for the MANY volunteers who have logged hours
running jack hammers, pounding with sledge hammers,
scooping and hauling out debris etc.

Much of the taping is done. Bathrooms and kitchen are textured and ready for
paint.
March 25, 2016

Stucco is being applied around the interior windows by the Driv-it crew

Electrician are wrapping up the rough-in.

Tile crew has just started in the restrooms.

The restrooms and kitchen are painted and flooring is in.

Kitchen cabinets arrived today and are being installed.
April 7, 2016

View from the current foyer. Doors are in.

Fellowship hall is painted and grid work is being put in place for ceiling tile.

"tile guy" is doing a meticulous job of laying tile in the bathrooms.

Flat roof crew is finishing the trim despite the blustery weather.